Hardware: PCB Assembly
Contents
Parts
Mechanical Drawing for RJ connectors.
Board Layout
Assembly
Install 40 pin header
1. Insert the 2x20 female header from the bottom side of the board.
- Error creating thumbnail: File missing
1.1 Insert the header from the bottom.
- Error creating thumbnail: File missing
1.2 Solder one pin on each end.
- Error creating thumbnail: File missing
1.3 Check the connector for alignment.
- Error creating thumbnail: File missing
1.4 Melt solder and straighten.
2. Solder the header on the top (component, silk screen) side of the board.
- Error creating thumbnail: File missing
2.1 Solder the rest of the pins.
Install the resistors
Number | Value (Ohms) | Purpose |
---|---|---|
R1 | 330 | Controls brightness of LED |
R2 | 200K | 12 V monitoring voltage divider |
R3 | 1K | 12 V monitoring voltage divider |
R4 | 2.2K | 12 V monitoring Reference voltage divider |
R5 | 2.2K | 12 V monitoring Reference voltage divider |
R6 | 1K | Rain gauge input filter |
- Error creating thumbnail: File missing
2.1 Insert the resistors.
Install male headers
- H8 1x4 and H9 1x6 for the HX711 board.
- H4 1x4 for console serial port
Install RJ1 and RJ2
Be very careful to check that all the leads are in the holes before you snap it in
- Insert the 1x4 and 1x6 female headers on the make headers.
- Install the HX711 board on the 1x4 and 1x6 female headers.
- Install LED D1.
- Install C1 4.7 mfd. Observe polarity.
- Install C3 .1 mfd. for rain gauge filter.
- Install 12 VDC power supply if used. See below for option 1 or 2.
Power Supply 1
- Install four 1x2 male headers.
- Install blue screw terminal block.
- Install four 1x2 female headers on the four 1x2 male headers.
- Install the Power Supply board on the four 1x2 female headers.
power Supply 2
- Install Fulree voltage regulator
- Install green spring terminal block.
Testing
If using Power Supply Option 1, the voltage must be adjusted to 5.o to 5.1 volts before connecting to the Pi or HX711 board.